Coal Conveyor in Missouri. With a stair tower in the middle, handrail/walkways across both sides of the conveyor and a pull station module at the base. This project took approx 4 months to complete.
Fabricator | 13RF |
Architect/Engineer | |
Location | Missouri |
Tonnage | 250 Tons |
Partial view with tower shown:
Full Conveyor Shown below:
Contact us today for free conslutaion or more information.
Get In Touch© 2021 Iresco Ltd.